检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨尚武 江金发 刘伟元 钟枫 Yang Shangwu;Jiang Jinfa;Liu Weiyuan;Zhong Feng(Zijin Mining Group Co.Ltd.,Zijin Mountain Gold and Copper Mine,Shanghang,Fujian 364200)
机构地区:[1]紫金矿业集团股份有限公司紫金山金铜矿,福建上杭364200
出 处:《江西建材》2024年第2期280-282,共3页Jiangxi Building Materials
摘 要:文中以福建省龙岩市某矿山浮选尾矿脱水工程3栋单层丙类厂房为例,对强夯置换法在素填土软弱地基施工中的应用进行分析。结果表明,按照试夯后的强夯方案参数对施工场地进行三遍点夯和满夯,经处理后的地基均满足承载力fak≥250 kPa且压缩模量Es≥25 MPa的要求。In this paper,the application of dynamic consolidation displacement method in the construction of weak foundation of plain filled soil is analyzed by taking 3 single-storey class C workshops of a mine flotation tailings dewatering project in Longyan City,Fujian Province as an example.The practical results show that the three pass point tamping and full tamping are carried out according to the parameters of the dynamic tamping scheme after the test,and the treated foundation can meet the requirements of the treatment bearing capacity fak≥250 kPa andthecompressionmodulusE,≥25MPa.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.31.88