栈桥钢管混凝土柱水下浇筑桩芯超灌高度控制技术  

Control Technology for the Over-filling Height of the Underwater Pouring Pile Core of the Steel Tube Concrete Column of the Trestle Bridge

在线阅读下载全文

作  者:章良兵 陈嘉威 Zhang Liangbing;Chen Jiawei(AVIC Institute of Geotechnical Engineering Co.Ltd.,Beijing 100098)

机构地区:[1]中航勘察设计研究院有限公司,北京100098

出  处:《江西建材》2024年第2期289-291,共3页Jiangxi Building Materials

摘  要:某深基坑栈桥临时竖向支撑柱采用钢管混凝土柱,为一柱一桩结构,在一次性水下混凝土浇筑时,桩芯超灌量影响后续基坑土方开挖过程中混凝土的剔凿量,而剔凿产生的振动可能影响钢管混凝土柱的承载能力。文中通过比选垂直插入法、封顶钢板法,分析了桩芯超灌量的影响因素,提出了混凝土水下灌注及桩孔同步回填工艺,并介绍了具体的施工流程。The temporary vertical support column of a certain deep foundation pit pier adopts a steel pipe concrete column,which is a one column,one pile structure.When pouring concrete underwater in one go,the excessive pouring of the pile core affects the amount of concrete chiseled during the subsequent excavation process of the foundation pit.The vibration generated by chiseling may affect the bearing capacity of the steel pipe concrete column.In the article,by comparing the vertical insertion method and the capped steel plate method,the influencing factors of pile core overflling were analyzed.The underwater concrete pouring and synchronous backfilling technology of pile holes were proposed,and the specific implementation process was introduced.

关 键 词:钢管混凝土柱 水下混凝土浇筑 超灌面高度 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象