检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张楠 Zhang Nan(Jinan Haihe Construction Project Management Co.,Ltd.,Jinan,Shandong 250000)
机构地区:[1]济南海河建设项目管理有限公司,山东济南250000
出 处:《现代工程科技》2024年第8期49-52,共4页Modern Engineering Technology
摘 要:针对道路建设过程中的盖梁施工进行了全面的方案设计和技术措施研究。首先介绍了工程概况和盖梁施工的重要性和难点,然后详细阐述了盖梁施工的工艺流程、技术措施、质量控制措施、安全措施等方面的内容。最后,对盖梁施工方案及技术措施进行了总结,为提高道路建设质量和安全性提供了有益的参考。A comprehensive scheme design and technical measures research have been conducted for the construction of cover beams during road construction.Firstly,the engineering overview and the importance and difficulties of beam capping construction were introduced.Then,the process flow,technical measures,quality control measures,safety measures,and other aspects of beam capping construction were elaborated in detail.Finally,a summary of the construction plan and technical measures for the cover beam was made,providing useful references for improving the quality and safety of road construction.
关 键 词:道路建设 盖梁施工 技术措施 质量控制 安全措施
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.99.38