检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:María Dolores Mainar-Toledo Ural Halaçoglu Hakan Alp Sahiller Tugrul Hazar Claudio Zuffi Maryori Díaz-Ramírez Giampaolo Manfrida
机构地区:[1]Research Centre for Energy Resources and Consumption(CIRCE),Zaragoza,50018,Spain [2]CIRCE Institute,University of Zaragoza,Zaragoza,50009,Spain [3]Zorlu Enerji,Istanbul,34394,Türkiye [4]Department of Industrial Engineering,University of Florence,Firenze,50134,Italy
出 处:《Energy Storage and Saving》2023年第4期631-638,共8页储能与节能(英文)
摘 要:Geothermal power plants(GPP)with high non condensable gases(NCG)content geothermal fluid have shown to be environmental impacting relating to their energy production,which could be critical if no corrective actions are achieved.The GPP of Kizildere 3 U1,located in Türkiye(Denizli),in where the geothermal fluid contains high percentage of CO_(2),99%of the NCG fraction,which represents the 3%of the geothermal fluid mass,is taken as a relevant case study to implement a new innovation consisting of NCG reinjection to reduce the amount of NCGs released to the atmosphere.In order to calculate the present environmental impacts which the plant is causing(baseline);and the potential reduction of environmental impacts which can be achieved with the innovation(reinjection),a life cycle assessment(LCA)calculation were developed.Primary data were collected for all the relevant stages of the energy conversion cycle and complemented where necessary with secondary data from other geothermal power plants studies.The main results of the baseline environmental assessment show that the construction phase is the most impacting phase due to the materials used in the power plant building construction,electrical generation equipment and distributed machinery and infrastructures;the effects in the operation phase are dominated by the geothermal fluid composition.In this sense,the application of CO_(2) reinjection at the Turkish site into the reservoir will prevent the emission of 1,700 tons⋅year1 in the pilot site and 10%of the total emissions released along the life span of the GPP.
关 键 词:Life cycle assessment Geothermal energy Non-condensable gases REINJECTION CO_(2)emissions avoided
分 类 号:TM62[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13