检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任财 REN Cai(China Railway 12th Bureau Group Fourth Engineering Co.,Ltd.)
机构地区:[1]中铁十二局集团第四工程有限公司
出 处:《智能建筑与智慧城市》2024年第5期72-74,共3页Intelligent Building & Smart City
摘 要:文章介绍了应用BIM技术开展高速铁路预应力混凝土连续梁桥施工的重要环节,分析了高速铁路预应力混凝土连续梁桥施工特点,在明确技术适用性的基础上,针对BIM模型建立、预应力筋碰撞检查、有限元仿真分析、施工过程监测管理等方面内容进行了强调,能够缓解以往设计与施工存在的衔接困难问题,提高施工过程监控水平。The paper introduces the important links of the application of BIM technology in the construction of high-speed railway prestressed concrete continuous beam bridges,analyzes the construction characteristics of high-speed railway prestressed concrete continuous beam bridges,and emphasizes the establishment of BIM models,collision inspection of prestressed reinforcement,finite element simulation analysis,construction process monitoring management and other aspects based on the clear applicability of the technology.This can alleviate the difficulties in connecting design and construction in the past,and improve the level of construction process monitoring.
关 键 词:高速铁路 预应力混凝土 连续梁桥施工 BIM技术应用
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.148.202