基于微震监测的不规则条带工作面冲击危险主控因素分析与防治  被引量:2

Analysis and prevention of impact hazard master control factorsin irregular strip working faces based on microseismic monitoring

在线阅读下载全文

作  者:周卫国 马泉磊 赵立坤 鲍耀 吴柏萱 ZHOU Wei-guo;MA Quan-lei;ZHAO Li-kun;BAO Yao;WU Bo-xuan(Pengzhuang Coal Mine,Shandong Energy Luxi Mining Industry,Heze 274701,China;School of Mining Engineering,China University of Mining and Technology,Xuzhou 221116,China)

机构地区:[1]山东能源鲁西矿业彭庄煤矿,山东菏泽274701 [2]中国矿业大学矿业工程学院,江苏徐州221116

出  处:《煤炭科技》2024年第2期115-119,共5页Coal Science & Technology Magazine

摘  要:不规则条带工作面往往存在冲击地压的可能,而冲击地压的破坏性极大,严重威胁煤矿安全生产。彭庄煤矿4307工作面属于不规则工作面,为保证安全回采,对四采区工作面的微震监测结果进行分析得出4307工作面冲击地压的主控因素为构造应力、断层构造及坚硬顶板,并论证主控因素的防控可行性,为工作面回采期间防冲工作的开展提供依据。Irregular strip working face always have the potential for impact ground pressure,which is extremely destructive and a serious threat to coal mine safety.The No.4307 working face of Pengzhuang Coal Mine belongs to the irregular working face.In order to ensure safe recovery,the microseismic monitoring results of the working face in the fourth mining area were analyzed,and it was found that the main controlling factors for impact ground pressure in the No.4307 working face were structural stress,fault structure,and hard roof.The feasibility of preventing and controlling the main controlling factors was demonstrated,providing a basis for the development of anti impact work during the mining period of the working face.

关 键 词:不规则工作面 冲击地压 微震监测 

分 类 号:TD713[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象