检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张潭 曹亮 ZHANG Tan;CAO Liang(Zhangshuanglou Coal Mine,Jiangsu Xukuang Energy Co.,Ltd.,Xuzhou 221616,China)
机构地区:[1]江苏徐矿能源股份有限公司张双楼煤矿,江苏徐州221616
出 处:《煤炭科技》2024年第2期142-146,共5页Coal Science & Technology Magazine
摘 要:诸多矿井在长期的开采过程中形成了形态不一的残煤资源,这些残煤资源由于赋存条件变化多、开采技术难度大、安全性差等原因,无法进行正规工作面布置。本着提高煤炭资源回收的目的,残煤区域制定的开采方案会形成各种不规则工作面,如何通过技术研究,快速高效地解决支架运输、安装以及溜槽安装等现实问题,对保证矿井的持续、安全和高效发展具有重要意义。In the long-term mining process,many mines have formed residual coal resources with different forms.These residual coal resources cannot be arranged in a formal working face due to various changes in occurrence conditions,difficult mining techniques,and poor safety.In order to improve the recovery of coal resources,the mining plan made in the residual coal area will form various irregular working faces,it is of great significance to solve the practical problems of support transportation,installation and chute installation quickly and efficiently to ensure the sustainable,safe and efficient development of mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7