检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李星星 莘燕 范志刚 LI Xingxing;XIN Yan;FAN Zhigang(State Grid Jibei Electric Power Co.,Ltd.Zhangbei County Power Supply Branch,Hebei Zhangbei 076450,China)
机构地区:[1]国网冀北电力有限公司张北县供电分公司,河北张北076450
出 处:《农村电气化》2024年第5期10-14,共5页Rural Electrification
摘 要:针对XX地区10 kV 586盘常营线察老口等分支线路存在的老旧设备和安全隐患问题,进行改造升级,改造范围包括12.1 km的10 kV线路,涉及多个分支线路及相应的杆塔、导线等配套设施。工程的主要目标是优化电网结构,提升供电可靠性,消除安全隐患,以满足当地日益增长的用电需求,通过采用新技术、新材料和新工艺,将有效提高线路的健康水平和运行效率,减少停电时间和停电范围,为当地居民和企业提供更加稳定、可靠的电力供应。This project aims to enhance the power supply capacity and reliability of the power grid by addressing the issues of outdated equipment and safety hazards on the 10 kV 586 Pan Changying Line and its branch lines such as Cha Laokou.The scope of the project includes a 12.1-kilometer 10 kV line,along with multiple branch lines and corresponding facilities such as poles and conductors.In order to meet the increasing electricity demand in the local area,the main objectives of the project are to optimize the power grid structure,improve power supply reliability,eliminate safety hazards.By adopting new technologies,materials and processes,the project can improve the health level and operational efficiency of the lines effectively,reduce outage time and scope,and provide a more stable and reliable power supply to local residents and businesses.
分 类 号:TM727[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49