检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛波 唐静文 李杨 XUE Bo;TANG Jingwen;LI Yang(State Grid Jiangsu Electric Power Company Siyang County Power Supply Company,Jiangsu Suqian 223700,China)
机构地区:[1]国网江苏省电力公司泗阳县供电公司,江苏宿迁223700
出 处:《农村电气化》2024年第5期60-62,共3页Rural Electrification
摘 要:为避免双电源切换过程中相位不对造成的事故,双电源线路或设备在投运前均须进行核相。传统低压母线槽核相工作是由3人利用万用表完成,其弊端是核相人员离母线槽裸露部分较近,容易造成触电事故,且效率低。文章介绍一种新型低压母线槽核相器,可实现2人在安全距离内完成核相,有效提升工作质效。Avoiding accidents caused by phase mismatch during the switching process of dual power sources is a goal that the power system operation department always pursues.Therefore,dual power lines or equipment need to undergo phase verification before being put into operation.The traditional low-voltage bus duct core phase work is completed by three people using a multimeter.The disadvantage is that the core phase personnel are relatively close to the exposed part of the bus duct,which can easily cause electric shock accidents and relatively low efficiency.This article introduces a new type of low-voltage bus duct core phase transformer,which can achieve two people to complete the core phase within a safe distance,effectively improving work quality and efficiency.
分 类 号:TM938.7[电气工程—电力电子与电力传动]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49