检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐俊杰 Xu Jun-jie
机构地区:[1]浙江鼎峰工程咨询有限公司,浙江缙云321400
出 处:《建筑技术开发》2024年第5期62-64,共3页Building Technology Development
摘 要:传统二次结构采用分层现浇方式进行施工,存在振捣质量难以保证、外观成型质量不稳定、入模口范围内密实度较差、施工效率低、成本高等问题。研究分别采用预制免拆模空腔模壳拼接成构造柱和圈梁,在构造柱和圈梁相交部位设置连接模壳,并在形成的构造柱和圈梁模壳内部顶升自密实混凝土,从而完成构造柱–圈梁一体化施工,解决了传统施工方法存在的上述问题,故该技术具有推广价值。The traditional secondary structure adopts a layered cast-in-place method for construction,which has problems such as difficulty in ensuring vibration quality,unstable appearance molding quality,poor compactness within the mold entry range,low construction efficiency,and high cost.Prefabricated non removable cavity formwork shells are used to splice into structural columns and ring beams,and connecting formwork shells are set at the intersection of the structural columns and ring beams.Self compacting concrete is lifted inside the formed structural columns and ring beam formwork shells to complete the integrated construction of structural columns and ring beams,solving the above-mentioned problems in traditional construction methods and having promotional value.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.135.12