作 者:龚斌 Gong Bin
出 处:《建筑技术开发》2024年第5期100-102,共3页Building Technology Development
基 金:广东省重点领域研发计划项目(2019B111108001)。
摘 要:该技术主要依托珠江三角洲某项目,盾构施工阶段出渣垂直高度为66.78 m,工作井有效直径为30.5 m,盾构隧洞长度为2.926 km,隧洞内径为5.4 m,隧洞坡度为0.5%,主盾构洞身掘进地质多为弱风化泥质粉砂岩,隧洞埋深40~60 m,采用φ6280土压平衡盾构施工。因受工作井深度及空间影响,盾构施工期间渣土运输问题是工程的重难点,研究通过优化出渣方式,改进出渣设备,以达到提高生产效率,节约施工成本,保证施工安全的目的。This technology mainly relies on the A2 standard project of the Pearl River Delta Water resources allocation project.The vertical height of slag discharge during the shield construction stage is 66.78 m,the effective diameter of the working well is 30.5 m,the length of the shield tunnel is 2.926 km,the inner diameter of the tunnel is 5.4 m,the slope of the tunnel is 0.5%,and the shield tunnel mainly crosses Ganzhu river.The excavation of the shield tunnel is mostly weak weathered mud siltstone,the tunnel is buried 40~60 m,and the,6280 soil pressure balance shield is used for construction.Affected by the depth and space of the working well,it is difficult to transport the slag during shield construction.The team takes overcoming difficulties as the starting point,through optimizing the slag method and improving the slag equipment,to achieve the purpose of improving production efficiency,saving construction costs and ensuring construction safety.The measures adopted can be used as reference for similar projects.
关 键 词:深竖井 长距离 盾构出渣 水平皮带机 垂直皮带机
分 类 号:U231.3[交通运输工程—道路与铁道工程] U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7