检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李旭枫 王少坡[1,2] 周瑶 常晶[1,2] 李荣光 LI Xufeng;WANG Shaopo;ZHOU Yao;CHANG Jing;LI Rongguang(Tianjin Chengjian University,Tianjin 300384,China;Tianjin Key Laboratory of Aquatic Science and Technology,Tianjin 300384,China;Tianjin Water Group Binhai Water Co.,Ltd.,Tianjin 300308,China)
机构地区:[1]天津城建大学,天津300384 [2]天津市水质科学与技术重点实验室,天津300384 [3]天津水务集团滨海水务有限公司,天津300308
出 处:《工业水处理》2024年第5期132-140,共9页Industrial Water Treatment
基 金:天津水务集团有限公司科技项目(2021KY-03)。
摘 要:天津某净水厂主水源为南水北调中线工程引江水,该水厂在常规工艺基础上增设预臭氧、后臭氧和活性炭强化工艺,以期进一步提升出水水质。建立小试试验装置,对以上各工艺强化常规工艺处理引江水的效果展开探讨。结果表明,絮凝剂PAC和FeCl_(3)的最佳投加量均为17 mg/L;在常规工艺基础上增设预臭氧或后臭氧工艺可以有效提升有机物的去除效果,增设活性炭工艺可同时提升浊度和有机物的去除效果,同时增设后臭氧和活性炭工艺强化去除浊度和有机物的作用最显著。预臭氧和后臭氧的最佳投加量均为1.0 mg/L,当原水中溴离子质量浓度高达150μg/L时,常规-后臭氧工艺、预臭氧-常规-后臭氧工艺中臭氧的投加量应调整为≤0.5 mg/L。The main water source of a water purification plant in Tianjin is Yangtze River water from Mid-route of South-to-North Water Transfer Project.On the basis of conventional processes,the plant has added pre-ozone,postozone and activated carbon enhancement processes to improve the quality of effluent.In this study,a small-scale experimental device was set up to investigate the effect of each process in enhancing of the conventional processes for treating Yangtze River water.The results indicated that the optimal dosages of flocculants PAC and FeCl_(3) were both 17 mg/L.The addition of pre-or post-ozone process to the conventional process could effectively enhance the removal of organic matter.The addition of activated carbon process could enhance the removal of turbidity and organic matter at the same time.The addition of post-ozone and activated carbon process could significantly enhance the removal of turbidity and organic matter.The optimum dosage for both pre-and post-ozone both were 1.0 mg/L.When the concentration of bromine ion in the raw water was up to 150 μ/L,the dosage of ozone in the conventional-postozone process and pre-ozone-conventional-post ozone process should be adjusted to ≤0.5 mg/L.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.106.232