检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建功 WANG Jiangong(Datong Co.,Ltd.of Shanxi Coal Transportation and Marketing Group)
机构地区:[1]山西煤炭运销集团大同有限公司
出 处:《现代矿业》2024年第4期159-161,共3页Modern Mining
摘 要:针对某煤矿工作面水害勘探问题,首先分析了区域内水文和地质情况,再根据瞬变电磁法基本原理,制定了工作面物探方案,并对物探结果进行反演分析。分析结果表明,工作面上部积水区位于走向400~1200m,是上覆煤层的采空区呈东低西高的特征导致。经过钻探,对积水区边界进行验证,确定积水区域为工作面走向420~1200m,根据出水特征分析,水源确为老空水。钻探结果和物探结果基本一致。Aiming at the problem of water disaster exploration in a coal mine working face,firstly,the hydrological and geological conditions in the area are analyzed.Then,according to the basic principle of transient electromagnetic method,the geophysical prospecting scheme of the working face is formulated,and the geophysical prospecting results are inverted and analyzed.The analysis results show that the water accumulation area on the upper part of the working face is located in the strike of 400~1200 m,which is caused by the characteristics of the goaf of the overlying coal seam,which is low in the east and high in the west.After drilling,the boundary of the water accumulation area was verified,and the water accumulation area was determined to be 420~1200 m along the strike of the working face.According to the analysis of the water outlet characteristics,the water source was determined to be goaf water.The drilling results are basically consistent with the geophysical results.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28