检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:霍欣 HUO Xin(China Railway First Survey and Design Institute Group Co.Ltd.,Xi′an Shaanxi 710043,China)
机构地区:[1]中铁第一勘察设计院集团有限公司,陕西西安710043
出 处:《铁道建筑技术》2024年第5期68-71,87,共5页Railway Construction Technology
基 金:陕西省科技厅重点研发计划项目(2023-YBSF-238)。
摘 要:陇东南西秦岭山区地质条件复杂,断裂、褶皱等构造活动强烈,铁路建设面临滑坡、危岩落石、砾岩岩溶、活动断裂等众多工程地质问题,严重制约着铁路的走向。为指导铁路选线,在详细调绘的基础上,提出了越岭山区地质选线的原则。结合具体线路方案,通过分析实际工程地质条件,考虑工程设置及施工安全风险等因素,对三段越岭线路进行了比选,选定了从砾岩岩溶影响区侧缘通过、缩短穿越第三系红层线路长度、绕避滑坡群和高位危岩落石等受工程地质问题影响较小的方案。本文的研究成果对于西秦岭山区相似地质条件下的铁路选线具有借鉴意义。The geological conditions in the West Qinling Mountains in Southeast Gansu are complex,and the tectonic activities such as faults and folds are strong.The railway construction is faced with many engineering geological problems such as landslide,dangerous rock falling,conglomerate karst,and active fault,which seriously restricts the trend of railway.To guide railway route selection,principles for geological route selection in mountainous areas have been proposed based on detailed investigation.Combined with the specific line scheme,through the analysis of the actual geological conditions,considering the engineering setting and construction safety risks and other factors,after comparing the routes of the three-section mountain-crossing,the schemes with less impacts from engineering geological problems,such as passing through the side of the conglomerate karst influence area,shortening the length of the route through the Tertiary red layer,and avoiding landslides and high dangerous rocks and falling rocks,were selected.The research results of this paper have reference significance for railway route selection under similar geological conditions in western Qinling Mountains.
关 键 词:西秦岭山区 地质选线 选线原则 工程地质问题 砾岩岩溶
分 类 号:U212.22[交通运输工程—道路与铁道工程] U212.32
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49