作 者:谢龙生 XIE Long-sheng(China Railway 25th Bureau Group Second Engineering Co.,Ltd.,Nanjing 210000,China)
机构地区:[1]中铁二十五局集团第二工程有限公司,南京210000
出 处:《价值工程》2024年第15期69-72,共4页Value Engineering
摘 要:丘北至砚山高速公路清平4号大桥的14个薄壁空心高墩的施工是项目关键。鉴于最高墩高达58m,施工条件复杂且场地有限,大型设备进场困难,本文提出采用爬模施工法进行薄壁空心高墩的施工。文章详细阐述了模板配置、爬架设计、组装方案以及特殊节段的施工方案,并介绍了塔吊选型与布置。此外,本项目还开发了一套先进的爬模控制、监测及预警系统,旨在提高施工精度、效率及安全性。通过本文的研究,为类似桥梁工程的高墩施工提供了有益的参考。The construction of 14 thin-walled hollow high piers of Qingping No.4 Bridge on the Qiubei to Yanshan Expressway is crucial to the project.Given that the highest pier reaches a height of 58 meters,the construction conditions are complex and the site is limited,making it difficult for large equipment to enter the site,this article proposes to use the climbing formwork construction method for the construction of thin-walled hollow high piers.The article elaborates on the template configuration,climbing frame design,assembly plan,and construction plan for special sections,and introduces the selection and layout of tower cranes.In addition,this project has also developed an advanced climbing control,monitoring,and early warning system aimed at improving construction accuracy,efficiency,and safety.This study provides useful references for the construction of high piers in similar bridge engineering.
关 键 词:薄壁空心高墩 爬模施工法 模板配置 爬架设计 塔吊选型
分 类 号:U445.559[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.179.145