检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨树红 轧文倩 殷寒 YANG Shuhong;YA Wenqian;YIN Han(Xinjiang Autonomous Region Water Resources Management Station,Urumqi 830000,China)
机构地区:[1]新疆维吾尔自治区水利管理总站,新疆乌鲁木齐830000
出 处:《水利建设与管理》2024年第5期25-30,49,共7页Water Conservancy Construction and Management
摘 要:中国地震动参数区划图调整使卡拉贝利水利枢纽大坝在校核地震工况条件下,局部抗震稳定不再满足现行规范要求,必须对大坝采取抗震加固措施。本文就卡拉贝利大坝抗震加固技术进行研究论证,现场试验结果显示:选定的坝体控制灌浆工艺、套阀管灌浆工法符合大坝现状条件,确定的控制灌浆范围和施工参数安全可靠性高、经济适用性好,大坝经灌浆处理后可以满足抗震稳定要求。The adjustment of China’s seismic parameter zoning map led to the Kalabeili Water Conservancy Hub Dam not meeting the current normative requirements for seismic stability under the conditions of a check earthquake.Therefore,seismic reinforcement measures had to be taken for the dam.This paper conducts a study and demonstration on the seismic reinforcement technology for the Kalabeili Dam.The results of on-site experiments show that the selected dam body control grouting process and sleeve-valve pipe grouting method are suitable for the current conditions of the dam.The determined control grouting range and construction parameters have high safety reliability and economic applicability.The dam,after grouting treatment,can meet the requirements for seismic stability.
分 类 号:TV223.7[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.209.231