检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:顾斌 Gu Bin(Shanghai Dongjie Construction(Group)Co.,Ltd.,Shanghai 200120,China)
机构地区:[1]上海东捷建设(集团)有限公司,上海200120
出 处:《科学与信息化》2024年第10期150-152,共3页Technology and Information
摘 要:在信息化背景下,高压电力电缆故障原因分析与试验方法经历了显著的改进和发展。借助信息技术,可采集电缆运行过程中的实时数据,构建电缆的状态模型,并利用机器学习算法和人工智能技术进行故障预测和分析。同时,通过智能化设备和在线监测技术,还可实现实时的状态监测和试验,从而使故障原因分析更加准确、高效和可靠,提高电网的可靠性和安全性。In the context of informatization,the high-voltage power cable fault cause analysis and test methods have undergone significant improvement and development.With the help of information technology,real-time data can be collected during cable operation,the state model of the cable can be constructed,and machine learning algorithms and artificial intelligence technology can be used for fault prediction and analysis.At the same time,through intelligent equipment and online monitoring technology,real-time state monitoring and testing can also be realized,so that the fault cause analysis is more accurate,efficient and reliable,and the reliability and safety of the power grid are improved.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229