检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:艾中路 陈生利 罗钟铭 沈志宏 Ai Zhonglu;Chen Shengli;Luo Zhongming;Shen Zhihong(Iron Making Plant of SGIS Songshan Co.,Ltd.,Shaoguan Guangdong 512123,China)
机构地区:[1]中南股份钢铁公司炼铁厂,广东韶关512123
出 处:《山西冶金》2024年第3期184-186,234,共4页Shanxi Metallurgy
摘 要:针对铁水包加废钢后铁水温降过大、铁水到炼钢工序后温度低的问题展开研究,系统阐述了韶钢自主开发的铁包加废钢预热烘烤系统及其技术。通过该技术成果的应用,消除了铁包加废钢后给铁水能量带来的损失,实现了炼钢铁水温度平均提升22℃、铁钢比降低至750 kg/t的优秀业绩,年创经济效益达500万元以上。This paper studies the problem that the temperature of molten iron drops too much after molten iron is added to scrap and the temperature is low after molten iron reaches steelmaking,and expounds the preheating and baking system of molten iron and scrap independently developed by Shaogang.Through the application of this technical achievement,the loss of molten iron energy caused by the addition of iron ladle and scrap steel has been eliminated,the average temperature of molten iron in steelmaking has been increased by 22℃,the ratio of iron to steel has been reduced to 750 kg/t,and the annual economic benefit has reached more than 5 million yuan.
分 类 号:TF321.5[冶金工程—冶金机械及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.39.45