检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏 Li Peng(Dongying Zhongsheng Engineering Cost Consulting Co.,Ltd.,Dongying 257000,Shandong Province,China)
机构地区:[1]东营中胜工程造价咨询有限公司,山东东营257000
出 处:《建筑与装饰》2024年第10期136-138,共3页Construction & Decoration
摘 要:随着经济的快速发展和人们对生活品质的要求不断提高,建筑行业也面临着巨大的挑战和机遇。为了满足市场需求和提高竞争力,越来越多的企业将目光投向了大型建筑项目。然而,由于缺乏有效的管理和控制手段,一些建筑项目往往会出现超支或延误的情况,给业主带来经济损失和信誉风险。因此,加强建筑设备安装施工阶段的工程造价管理和控制变得尤为重要。With the rapid development of the economy and the continuous improvement of people's requirements for the quality of life,the construction industry is also facing great challenges and opportunities.In order to meet the market demand and improve the competitiveness,more and more enterprises are focusing on large-scale construction projects.However,due to the lack of effective management and control means,some construction projects often appear overruns or delays,which brings economic losses and credit risks to the owners.Therefore,it is particularly important to strengthen the management and control of the project cost in the installation and construction stage of construction equipment.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.177.255