检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘俊 Liu Jun(CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou,Guangdong 510290)
机构地区:[1]中交第四航务工程局有限公司,广东广州510290
出 处:《现代工程科技》2024年第9期37-40,共4页Modern Engineering Technology
摘 要:公路工程桥梁项目涉及基坑施工、路基施工、混凝土浇筑施工、钢混组合梁施工等多种施工工序,施工过程复杂且施工安全风险较高,需要加强安全风险控制措施,以降低施工安全事故发生概率。为保证工程施工安全,通过太龙公路扩容提速工程施工实践,对钢混组合梁施工安全风险分析和应对措施进行了深入研究。结合太龙公路扩容提速工程的特点,介绍了钢混组合梁施工安全风险分析、估测方法以及控制措施,为同类项目施工提供有益借鉴。The highway engineering bridge project involves various construction processes such as foundation pit construction,roadbed construction,concrete pouring construction,and steel-concrete composite beam construction.The construction process is complex and the construction safety risk is high.It is necessary to strengthen safety risk control measures to reduce the probability of construction safety accidents.In order to ensure construction safety,in-depth research was conducted on the safety risk analysis and response measures for the construction of steel-concrete composite beams through the construction practice of the expansion and speed increase project of the Tailong Highway.Based on the characteristics of the expansion and speed increase project of the Tailong Highway,this paper introduces the safety risk analysis,estimation methods,and control measures for the construction of steel-concrete composite beams.It is hoped that this can provide useful reference for the construction of similar projects.
分 类 号:U445.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49