检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:殷世刚 YIN Shigang
机构地区:[1]中铁四局集团第四工程有限公司,安徽合肥230041
出 处:《重庆建筑》2024年第5期60-62,共3页Chongqing Architecture
摘 要:近年来,各大城市正大规模开展地铁建设,为了减小地下交通施工对地面交通的干扰,地铁车站的建设方式逐渐由明挖向暗挖转变。然而,暗挖地铁车站的断面较大,且位于地下,多采用竖井或斜井进入车站,如何安全、快速完成斜井转正洞进入车站主体施工,是施工控制的重点、难点。该文以某地铁暗挖车站为例,就斜井转正洞的传统施工方法进行了阐述,并对传统施工方法存在的缺点进行了分析,在此基础上提出新的施工方法,并对相关施工技术进行了总结。In recent years,major cities are carrying out large-scale subway construction.To reduce the interference of underground traffic construction on ground traffic,the construction method of subway stations has gradually shifted from open-cut excavation to underground excavation.However,due to the large cross-section of underground subway stations and their location underground,vertical shafts or inclined shafts are often used to access the stations.The key and difficult point of construction control lies in how to safely and quickly complete the transition from inclined shafts to the main tunnel for the main construction of the station.Taking a subway underground excavation station as an example,this article elaborates on the traditional construction method of the transition from inclined shafts to the main tunnel,analyzes the shortcomings of the traditional construction method,proposes a new construction method based on this,and summarizes relevant construction technologies.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62