盾构法隧道穿越既有铁路的工程节点研究  

Study of Shield Tunnel Passing through Existing Railway

在线阅读下载全文

作  者:曹昱 Cao Yu

机构地区:[1]宁波市轨道交通集团有限公司

出  处:《隧道与轨道交通》2024年第1期69-74,83,共7页Tunnel and Rail Transit

摘  要:随着城市地下空间建设的快速发展,盾构法隧道穿越铁路工程的工况越来越多。如何在保证铁路正常运营的条件下,控制盾构穿越施工引起的铁路路基沉降变形是重中之重。结合轨道交通工程,采用有限元软件,介绍和分析了盾构机下穿、侧穿施工对铁路的影响,并提出适应性施工措施。With the rapid development of urban underground space construction,there are more and more shield tunnel projects passing through railways.It is most important to control the settlement and deformation of railway roadbed caused by shield machine tunneling through the railway under the normal operation.Combined with the rail transit project,the impact of shield machine tunneling underneath or side passing through a railway is introduced and analyzed by the finite element software,and adaptive construction measures are proposed.

关 键 词:地下空间 盾构法隧道 盾构机 穿越施工 有限元分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程] U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象