检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜文富 侯芳[3] 付青 孙文来 JIANG Wenfu;HOU Fang;FU Qing;SUN Wenlai(China National Building Materials Group Shandong Building Material&Surveying Institute Co.,Ltd.,Jinan 250100;Shandong Branch of China National Geological Exploration Center of Building Materials Industry,Jinan 250100;Shuifa Testing Technology Group Co.Ltd.,Jinan 250100;Zhejiang Branch of China Geological Exploration Center of Building Materials Industry,Hangzhou 31o000)
机构地区:[1]中建材山东勘测设计研究院有限公司,济南250100 [2]中国建筑材料工业地质勘查中心山东总队,济南250100 [3]水发检测科技有限公司,济南250100 [4]中国建筑材料工业地质勘查中心浙江总队,杭州310000
出 处:《土工基础》2024年第2期209-214,260,共7页Soil Engineering and Foundation
摘 要:某厚层富水杂填土建筑场地位于济南市黄河冲积区,杂填土层最厚处达13.2 m,含有大量建筑垃圾碎块,局部看可见大块碎块和钢筋混凝土块。项目拟建五个3~7层建筑物和一个负1层地下车库,基坑开挖最大深度6.80 m。通过对场地的勘察、强夯、孔内深层强夯桩复合地基、降排水措施和基坑支护设计等方面的全面展示和分析研究,总结得出了最可行的孔内深层强夯桩的冲击成孔、管井的全护筒跟进旋挖钻孔等施工工艺和关键点,详细划分了强夯和基坑的范围,并深入探讨了管井降水系统应如何较好地配合强夯、孔内深层强夯和基坑开挖施工。以期为类似杂填土场地的建筑工程提供参考。This typical building site with saturated and thick miscellaneous fill is in a Yellow River alluvial plain in Jinan City.The site was a borrow pit for a brick kiln,which was abandoned many years ago.The maximum thickness of the miscellaneous fill is 13.2 m.This miscellaneous fll soil layer contains a large number of construction waste,some of which are large blocks and steel reinforced concrete blocks.The project includes five buildings varying 3-7 stories with one underground basement.The maximum depth of the foundation excavation is 6.80 m.This article shows the engineering investigation,the dynamic compaction,the down-hole dynamic compaction,the dewatering-draining methods and the design of the deep excavation supporting structure comprehensively.It is summarized that the impact method is the most feasible for the down-hole dynamic compaction.The full-length casing follow-up rotary excavation is the best construction technology for the installation of the dewatering point well,etc.The range of the dynamic compaction and foundation excavation are discussed in detail.The in-depth discussions also include of how the system of the dewatering point well coordinates with the dynamic compaction,the downhole dynamic compaction,the dewatering-draining methods as well as the deep excavation supporting structure.All of the above might provide some reference to the constructions with the similar miscellaneous fill sites.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229