检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡昕宇 HU Xinyu(Shangrao Kexin Water Resources and Hydropower Survey and Design Consulting Co.,Ltd.,Shangrao 334000,China)
机构地区:[1]上饶市科信水利水电勘察设计咨询有限公司,江西上饶334000
出 处:《云南水力发电》2024年第5期22-24,共3页Yunnan Water Power
摘 要:为合理选择水库正常蓄水位,遵循合理利用工程所在地区的地形地质条件,充分利用水资源,在保证工程任务和效益的基础上,尽可能降低库区淹没影响和工程投资的基本原则,初拟94.50 m、95.50 m和96.50 m共3个正常蓄水位方案进行综合技术经济比选。综合工程地质条件、水库淹没处理、枢纽及建筑物布置、生态环境、水资源利用及工程经济性,推荐吊钟水库正常蓄水位95.50 m。This paper aims to reasonably select the normal storage level of reservoir,follow the terrain and geological conditions of the area where the project is located,and fully utilize water resources.It follows the basic principle of minimizing the impact of reservoir inundation and engineering investment while ensuring engineering tasks and benefits.A comprehensive technical and economic comparison is proposed for three normal storage level schemes,namely 94.50m,95.50m,and 96.50m.Based on the comprehensive engineering geological conditions,reservoir inundation treatment,hub and building layout,ecological environment,water resource utilization,and engineering economy,it is recommended that the normal storage level of Diaozhong Reservoir be 95.50m.
关 键 词:吊钟水库 建设任务 正常蓄水位 水库淹没 经济比较
分 类 号:TV213[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49