检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚元江 陈加杰 鲍兴艳 王进 GONG Yuanjiang;CHEN Jiajie;BAO Xingyan;WANG Jin(Yunnan Dianzhong Water Diversion Engineering Co.,LTD,Kunming 650000,China;Yunnan Water Resources and Hydropower Engineering CO.LTD,Kunming 650000,China)
机构地区:[1]云南省滇中引水工程有限公司,云南昆明650000 [2]云南省水利水电有限公司,云南昆明650000
出 处:《云南水力发电》2024年第5期117-121,共5页Yunnan Water Power
摘 要:近年来,国家对水网建设投入力度不断加大,开工数量和投资规模均突破历史新高。滇中引水工程是目前全国在建的重大水利工程之一,其输水隧洞采用混凝土衬砌以改善水流条。该工程衬砌工具采用底拱钢模台车和边顶拱钢模台车,有效满足了混凝土衬砌紧跟开挖支护施工的要求,并根据现场混凝土施工需要,对钢模台车施工技术做了改进和发展,施工质量和进度得到保障。In recent years,the country has continuously increased its investment in water network construction,with the number of construction projects and investment scale breaking historical records.Dianzhong Water Diversion Project is one of the major water conservancy projects currently under construction nationwide,and its water conveyance tunnel is lined with concrete to improve the water flow strip.The lining tools for this project use bottom arch steel formwork trolleys and side and top arch steel formwork trolleys,effectively meeting the requirements of concrete lining closely following excavation support construction.According to the on-site concrete construction needs,the construction technology of steel formwork trolleys has been improved and developed,ensuring construction quality and progress.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.220.9