基于Vine-Copula的高土石坝变形监控模型研究  被引量:2

Research on deformation monitoring model for high earth-rock dams based on Vine-Copula

在线阅读下载全文

作  者:陈天赐 李艳玲[1,2] 张芳 陈枭 CHEN Tianci;LI Yanling;ZHANG Fang;CHEN Xiao(State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu 610065,China;College of Water Resources and Hydropower,Sichuan University,Chengdu 610065,China;Power China Guiyang Engineering Corporation Limited,Chengdu 610065,China;Zhenxiong County Water Bureau,Zhaotong 657200,China)

机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065 [2]四川大学水利水电学院,四川成都610065 [3]中国电建集团贵阳勘测设计研究院有限公司,四川成都610065 [4]镇雄县水务局,云南昭通657200

出  处:《人民长江》2024年第5期206-212,218,共8页Yangtze River

基  金:国家重点研发计划项目(2018YFC0407103)。

摘  要:针对高土石坝变形监控模型主要基于单一测点,无法定量考虑测点空间关联性的问题,构建了基于Vine-Copula的变形监控模型,并提出了基于蒙特卡洛随机抽样法的空间置信域预警阈值设置方法。在模型构建过程中,充分考虑了多测点之间的时序特性和空间相关性,利用Vine-Copula方法对变形数据进行精确建模和分析,以揭示高土石坝变形的整体趋势。同时,通过蒙特卡洛随机抽样法确定了空间置信域,为预警阈值的设定提供了科学依据。工程实践表明:该模型模拟结果能够准确反映高土石坝变形的整体趋势,具有较高的合理性和精度,有效实现了监测效应量向高土石坝空间全域的拓展。研究成果可为高土石坝安全监控提供新的思路和方法,具有重要的理论意义和实践价值。Aiming at the problem that the deformation monitoring model for high earth-rock dams is mainly based on a single measuring point and cannot quantitatively consider the spatial correlation of measuring points,a deformation monitoring model based on Vine-Copula was constructed,and a spatial confidence domain early warning threshold setting method based on Monte-Carlo random sampling method was proposed.In the process of the model construction,the time series characteristics and spatial correlation between multiple measuring points were fully considered,and the Vine-Copula method was used to accurately model and analyze the deformation data to reveal the overall trend of high earth-rock dam deformation.At the same time,the spatial confidence region was determined by Monte-Carlo random sampling method,which provided a scientific basis for the setting of early warning threshold.The engineering practice showed that the model simulation results can accurately reflect the overall deformation trend of high earth-rock dam,with high accuracy and rationality,and effectively realize the expansion of monitoring effect-quantity to the whole space of high earth-rock dams.The research results can provide new ideas and methods for the safety monitoring of high earth-rock dams,and have important theoretical significances and practical values.

关 键 词:高土石坝 变形监控模型 Vine结构 COPULA函数 空间置信域 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象