检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈艳[1] CHEN Yan(China Railway 18th Bureau Group Fifth Engineering Co.,Ltd.,300459,Tianjin,China)
机构地区:[1]中铁十八局集团第五工程有限公司,天津300459
出 处:《建筑技术》2024年第10期1181-1184,共4页Architecture Technology
摘 要:某城市新建明挖区间地质条件差,基坑深度范围内基本为填土及淤泥底层;周边风险源很多,邻近既有轨道交通线路、高架桥梁桩基等;结构设计复杂,明挖区间本身与其围护结构采用叠合墙,基础形式不一。采用GTSNX岩土数值模拟软件,建立三维数值模型,结合施工方案,模拟基坑开挖过程,并分析其周边风险源的位移变化规律,为施工风险的控制提供了一定的依据,可为类似工程施工提供一定的借鉴。A new open-cut section in a city involves poor geological conditions and the fill and silt bottom mostly within the foundation pit depth.There are also many hazard sources around,such as pile foundations of existing rail transit lines and viaducts.The structural design is complex,in which the open-cut section and its enclosure include superimposed walls with different types of foundation.With the GTSNX geotechnical numerical simulation software,a 3D numerical model was established,and the process of foundation pit excavation was simulated in line with the construction scheme.Furthermore,the rules of displacement changes of surrounding hazard sources were analyzed.This study provides a basis for construction risk control and a reference for the construction of similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170