检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于晔 Yu Ye(Radio,Film and Television Design&Research Institute Co.,Ltd,Beijing,100045)
机构地区:[1]中广电广播电影电视设计研究院有限公司,北京100045
出 处:《制冷与空调(四川)》2024年第2期262-267,共6页Refrigeration and Air Conditioning
摘 要:以实际项目为例,通过介绍张家口怀来某数字经济园区两栋数据中心的空调系统形式,分析对比水冷系统和间接蒸发冷却系统的各项指标,包括PUE、WUE、SUE、初投资、运行费用等数据,结果表明在同等建筑规模情况下,采用水冷冷冻水系统的数据中心可承载的机柜数量更多,初投资更少;而采用间接蒸发冷却空调系统的数据中心在节能、节水、运行费用方面更具优势。This paper takes the actual project as an example.By introducing the air-conditioning system form of two data centers in a digital economic park,this paper analyzes the indicators of comparison of water-cooled systems and indirect evaporative cooling systems,Including PUE,WUE,SUE,initial investment,operating costs,etc.,the results show that the number of cabinets that can be loaded by the data center of the water-cooled system is more,and the initial investment is less;The data center with the evaporative cooling system is more advantageous in energy conservation,water saving and operating costs.
关 键 词:数据中心 水冷冷冻水系统 间接蒸发冷却空调系统 PUE WUE 经济性分析
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49