检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王正达 张春旭 王成燕 黄国涛 丁玉宸 WANG Zhengda;ZHANG Chunxu;WANG Chengyan;HUANG Guotao;DING Yuchen(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第S01期66-69,共4页Yunnan Water Power
摘 要:隧洞开挖支护过程中常因各种原因造成塌方,除了事前加强预报预防外,更应注重塌方后如何有效地组织塌方处理。在保证安全与质量的前提下加快处理进度,使工期损失与资金投入降到最低。通过对滇中引水石鼓水源工程通风管道洞开挖过程中发生塌方原因的分析与处理方法阐述,为后续同类型隧洞塌方处理提供技术支撑。During tunnel excavation and support,landslides are often caused by various reasons.In addition to strengthening prediction and prevention in advance,more attention should be paid to how to effectively organize landslide treatment after collapse.Accelerating the processing progress while ensuring safety and quality can minimize project losses and capital investment.This paper analyzes the causes of collapse during the excavation process of the ventilation pipeline tunnel in Shigu Water Source Project of Dianzhong Water Diversion,and describes the treatment methods,providing technical support for the subsequent collapse treatment of similar tunnels.
分 类 号:TV554.9[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49