检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱学俊 李杨林 ZHU Xuejun;LI Yanglin(Chuxiong Xinyuan Water Conservancy and Electric Power Survey and Design Co.,LTD.,Chuxiong 675000,China)
机构地区:[1]楚雄欣源水利电力勘察设计有限责任公司,云南楚雄675000
出 处:《云南水力发电》2024年第S01期70-73,共4页Yunnan Water Power
摘 要:以楚雄市腊武地水库修建过程中遇到的人工洞穴问题为对象,研究了水库岸坡的处理方案及投资情况。腊武地水库选址于存在煤洞的位置,煤洞的存在可能导致岸坡稳定性受到影响,造成蓄水后岸坡垮塌和水库渗漏问题。为了解决这些问题,提出了不同的处理方案,最终选择了适当的煤洞处理方案,并进行了投资估算。研究结果强调了前期勘察工作的重要性。This paper focuses on the artificial cave problem encountered during the construction of Lawudi Reservoir in Chuxiong City,and studies the treatment plan and investment situation of the reservoir bank slope.The location of Lawudi Reservoir is located in a location with coal caves,which may affect the stability of the bank slope,leading to bank slope collapse and reservoir leakage after water storage.To address these issues,different solutions have been proposed.Finally,an appropriate coal mine treatment plan was chosen and an investment estimate was made.The research findings emphasize the importance of preliminary survey work.
分 类 号:TV697.33[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4