检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高锡良 张雄 杨立中 马勇 GAO Xiliang;ZHANG Xiong;YANG Lizhong;MA Yong(Chuxiong Xinyuan Water Conservancy and Electric Power Survey and Design Co.,LTD.,Chuxiong 675000,China)
机构地区:[1]楚雄欣源水利电力勘察设计有限责任公司,云南楚雄675000
出 处:《云南水力发电》2024年第S01期74-76,共3页Yunnan Water Power
摘 要:阿庆争水库是一个典型的山区小型水库。勘察发现,其河床坝基冲积层承载力低、易发生压缩变形和地震液化。对比换填法和强夯法后,选择了经济环保的强夯法处理坝基。强夯后,冲积层的干密度、承载力、密实度和剪切波速显著提高,孔隙比和渗透系数大幅降低,且不影响下游坝基排水。观测结果显示,大坝施工及封顶至今未见异常沉降变形和排水问题,有效解决了工程地质问题。此强夯处理可为类似工程提供参考。Aqingzheng Reservoir is a typical small-scale reservoir in mountainous areas.The survey found that the bearing capacity of the alluvial layer on the riverbed dam foundation is low,and it is prone to compression deformation and seismic liquefaction.After comparing the replacement method and dynamic compaction method,the economical and environmentally friendly dynamic compaction method was chosen to treat the dam foundation.After dynamic compaction,the dry density,bearing capacity,compactness,and shear wave velocity of the alluvial layer are significantly increased,while the porosity and permeability coefficient are significantly reduced without affecting the drainage of the downstream dam foundation.The observation results show that there have been no abnormal settlement deformation or drainage problems observed during the construction and topping of the dam,effectively solving the engineering geological problems.This dynamic compaction treatment can provide reference for similar projects.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.64.92