检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔亚军 徐全基 CUI Yajun;XU Quanji(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第S01期105-108,共4页Yunnan Water Power
摘 要:中国水利水电第十四工程局有限公司承建向家坝灌区邱场分干渠自贡段工程,该工程项目被称为川南地区“都江堰”、国务院“十三五”期间规划的172项重大水利工程之一,属于特大型水利工程。结合向家坝灌区北总干渠一期一步工程建设中优化物资采购策略、确立正确的采购目标,制定健全完善的管理制度,从而降低物资采购成本和供应链风险,提高市场竞争力。The concrete required for the treatment and ancillary engineering of Zhengang landslide in Deqin County,Yunnan Province,as well as the upstream emergency rescue channel project,is approximately 251.4×104m3.The material source for the sand and gravel processing system is mainly basalt.It has advantages such as good corrosion resistance,compression resistance,and oxidation resistance,and is difficult to process and crush.It is widely used in various industrial fields.In order to effectively control the quality of finished aggregates,achieve green energy conservation and environmental protection,and ensure the stable operation and production of normal sand and gravel processing systems,this paper studies and develops the optimal process plan and supporting facilities for processing basalt.It can ensure that the quality of sand and gravel aggregates meets the specifications and design requirements,and save operating costs.
分 类 号:TV512[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46