作 者:郑峰 郑泽楠 孙涛 伍仰金 郑传良 陈志东 ZHENG Feng;ZHENG Zenan;SUN Tao;WU Yangjin;ZHENG Chuanliang;CHEN Zhidong(School of Electrical Engineering and Automation,Fuzhou University,Fuzhou 350108,China;Shennongjia Power Supply Company,State Grid Hubei Electric Power Company,Shennongjia 442422,China;Ningde Power Supply Company,State Grid Fujian Electric Power Company,Ningde 352100,China;Lanzhou Power Supply Company,State Grid Gansu Electric Power Company,Lanzhou 730070,China)
机构地区:[1]福州大学电气工程与自动化学院,福州350108 [2]国网湖北省电力有限公司神农架供电公司,神农架442422 [3]国网福建省电力有限公司宁德供电公司,宁德352100 [4]国网甘肃省电力有限公司兰州供电公司,兰州730070
出 处:《高电压技术》2024年第5期2078-2087,I0023-I0026,共14页High Voltage Engineering
基 金:国网湖北省电力有限公司科技项目(5215N0220001)。
摘 要:已有限流器优化配置方法大多以电阻、电感型限流器为配置对象,且只考虑每条线路均配置限流器的工况,降低系统经济效益,因此提出一种计及新型柔性直流限流器(novel flexible fault current limiter,NFFCL)运行特性、位置、数量等因素的优化配置方法。首先基于换流站和NFFCL简化模型,构建含NFFCL直流系统故障电流计算模型,并在5节点直流系统验证其准确性;其次,以NFFCL成本、限流效果为目标函数,以断路器最大开断电流为约束条件,构建多目标优化配置模型,并对NSGA-Ⅱ算法中的拥挤度计算进行改进,以实现优化配置过程中NFFCL安装数量与容量的解耦;最后,采用改进拥挤度计算的NSGA-Ⅱ算法求解得到11节点直流系统的NFFCL优化配置方案,并通过限流器成本、安装数量、限流效果之间的关系选取最终方案。Most of the existing current limiter optimal configuration methods take resistive and inductive current limiters as configuration objects,and only consider the situation that each line is equipped with a current limiter,which reduces the economic benefit of the system.Therefore,an optimal configuration method considering the operating characteristics,position,and quantity of novel flexible fault current limiter(NFFCL)are proposed in this paper.Based on the simplified model of converter station and NFFCL,a DC system fault current calculation method with NFFCL is constructed,and its accuracy is verified in the 5-node DC system.The cost and current limiting effect of NFFCL are taken as the objective functions and maximum breaking current of circuit breaker is taken as the constraint,then an optimal configuration model is constructed,and the congestion calculation in NSGA-Ⅱalgorithm is improved to decouple the relationship between NFFCL installation quantity and capacity.Finally,the NFFCL optimal configuration scheme of 11-bus DC system is obtained by using NSGA-Ⅱalgorithm with improved congestion calculation,and the final scheme is selected according to the relationship among cost,installation quantity and current limiting effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7