检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Razieh Keshavarzi Mehdi Jahangiri
机构地区:[1]Energy and Environment Research Center,Shahrekord Branch,Islamic Azad University,Shahrekord,Iran
出 处:《Energy Engineering》2024年第6期1381-1401,共21页能源工程(英文)
摘 要:Nowadays,the use of renewable energies,especially wind,solar,and biomass,is essential as an effective solution to address global environmental and economic challenges.Therefore,the current study examines the energy-economic-environmental analysis of off-grid electricity generation systems using solar panels,wind turbines,and biomass generators in various weather conditions in Iran.Simulations over 25 years were conducted using HOMER v2.81 software,aiming to determine the potential of each region and find the lowest cost of electricity production per kWh.In the end,to identify the most suitable location,the Technique for Order Preference by Similarity to Ideal Solution(TOPSIS)method was employed to rank different stations based on simulation output parameters and some other influential factors.Considering the evaluation of various parameters,the stations in Yazd,Marand,and Dezful achieved the best results,while the stations in Ramsar,Shahrekord,and Gonbad presented the least favorable outcomes.In Yazd,the wind turbine is an economic priority,and a 100 kW wind turbine is utilized in the optimal system.In Yazd,where the simultaneous use of renewable energies is most prominent,the lowest pollutant production occurred with a quantity of 1174 kg/year.Annual energy losses are highest in Jask station and lowest in Yazd.
关 键 词:Multi-criteria decision-making method residential scale biomass generators normalize weight
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70