检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭允芳 PENG Yun-fang(China Railway Siyuan Survey and Design Co.Ltd.,Wuhan 430063,China)
机构地区:[1]武汉铁四院工程咨询有限公司,武汉430063
出 处:《工程建设与设计》2024年第10期224-226,共3页Construction & Design for Engineering
摘 要:在简述铁路建设项目咨询评估概念、咨询评估现状以及咨询评估工作重要性的基础上,结合笔者多年来咨询评估工作的实践经验,对铁路建设项目预可研、可研报告、项目申请报告、初步设计全过程咨询评估工作的关键问题进行深入分析,总结咨询评估工作中遇到的困难及问题,并提出相关建议。Based on the brief introduction of the concept,present situation and importance of the consultation and evaluation of railway construction projects,combined with years of practical experience in the work of consultation and evaluation of the author,this paper analyzes the key issues in the consultation and evaluation of pre-feasibility study,feasibility study report,project application report and preliminary design process of railway construction project,summarizes the difficulties and problems encountered in consulting and evaluation work,and puts forward relevant suggestions.
关 键 词:铁路建设项目 咨询评估 项目建议书 可行性研究 项目申请报告 初步设计
分 类 号:U212.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62