MODFLOW-CFPv2 模型在岩溶隧道突涌水及对地下水环境影响中的应用: 以云南鹤庆锰矿沟岩溶水系统为例  

Application of MODFLOW-CFPv2 model in karst tunnel water inrush and its impact on groundwater environment:Example of the Mengkuanggou karst water system in Heqing County,Yunnan Province

在线阅读下载全文

作  者:肖竞 万军伟 成建梅 李仲夏 余杭 李槿鸿 袁帅 XIAO Jing;WAN Junwei;CHENG Jianmei;LI Zhongxia;YU Hang;LI Jinghong;YUAN Shuai(School of Environmental Studies,China University of Geosciences(Wuhan),Wuhan 430078,China;Yunnan Engineering Geology No.2 Reconnaissance Yard,Kunming 650218,China)

机构地区:[1]中国地质大学(武汉)环境学院,武汉430078 [2]云南地质工程第二勘察院有限公司,昆明650218

出  处:《地质科技通报》2024年第3期301-310,共10页Bulletin of Geological Science and Technology

基  金:国家自然科学基金项目(42172278,U1911205);云南省滇中引水工程建设管理局招标项目“云南省滇中引水工程昆明玉溪红河段地下水监测”。

摘  要:滇中地区构造复杂、岩溶发育,隧洞突涌水及泉流量衰减是隧洞施工过程中最棘手的问题之一。锰矿沟岩溶水系统岩溶管道化程度高,岩溶裂隙与岩溶管道2种含水介质差异显著。采用MODFLOW-CFPv2双重介质数值模型对锰矿沟岩溶水系统展开数值模拟研究,精细刻画岩溶管道与引水隧洞,进而掌握隧洞施工对地下水流场影响以及泉流量变化的规律。结果表明:(1)MODFLOW-CFPv2模型能够刻画岩溶地区复杂的地质结构,较好地模拟研究区地下水位的动态特征和岩溶泉流量响应特征。(2)在强排工况下隧洞单位长度最大涌水量为164 m^(3)/(d·m),单位长度稳定涌水量为69 m^(3)/(d·m),锰矿沟岩溶泉流量也出现显著下降的趋势,在模拟期内平均泉流量从天然条件下1578 L/s下降至1098 L/s,总体减少了30.4%;峰值泉流量从2133 L/s下降至1375 L/s,减少了35.5%,强排工况施工会对隧洞工程施工和地下水环境造成显著影响;限排工况下隧洞单位长度最大涌水量为39 m^(3)/(d·m),单位长度稳定涌水量为24 m^(3)/(d·m),隧洞单位长度涌水量显著降低,锰矿沟岩溶泉流量的下降趋势也得到了一定程度的改善,模拟期内平均泉流量降低至1284 L/s,减少了18.6%,峰值泉流量降低至1617 L/s,减少了22.1%。采用的MODFLOW-CFPv2双重介质模型具有较精确刻画岩溶区管道、溶洞、裂隙共存的高度非均质岩溶水系统的能力,能够定量评价香炉山隧洞施工对锰矿沟岩溶水系统地下水流场及泉流量的影响,为香炉山隧洞工程的突涌水灾害防治提供参考依据,也为岩溶地区复杂地质条件下地下水研究提供借鉴经验。[Objective]In the central Yunnan region,the geological structure is complex and karst formations are prevalent.Sudden water gushing and attenuation of spring flow are among the most difficult problems in tunnel construction.The Mengkuanggou karst water system exhibits a high degree of karst conduitization,with significant differences between karst fissures and karst conduits.[Methods]This study employs the MODFLOW-CFPv2 dual medium numerical model to simulate the karst water system of Mengkuanggou,providing a detailed description of karst pipeline and diversion tunnel to understand the influence of tunnel construction on groundwater flow and spring flow.[Results]The results show that(1)The MODFLOW-CFPv2 model can describe the complex geological structure of karst areas,and simulate the dynamic characteristics of the groundwater level and the response characteristics of karst spring flow in the study area.(2)Under the condition of strong discharge,the water inflow per unit length of the tunnel is 164 m^(3)/d·m,with a stable water inflow of 69 m^(3)/d·m,while the Mengkuanggou karst spring flow shows a significant downwards trend.During the simulation period,the average spring flow decreased from 1578 L/s under natural conditions to 1098 L/s,an overall decrease of 30.4%,and the peak flow rate decreased from 2133 L/s to 1375 L/s,a decrease of 35.5%.The construction of strong discharge conditions will have a significant impact on tunnel construction and the groundwater environment.Under the condition of limited discharge,the maximum water inflow of the tunnel is 39 m^(3)/d·m,and the stable water inflow is 24 m^(3)/d·m.The water inflow of the tunnel is significantly reduced,and the downwards trend of the karst spring flow in Mengkuanggou is also improved to a certain extent.During the simulation period,the average spring flow is reduced to 1284 L/s,a reduction of 18.6%,and the peak flow is reduced to 1617 L/s,a decrease of 22.1%.[Conclusion]The MODFLOW-CFPv2 dual-medium model used in this study accurately describes

关 键 词:双重介质 数值模拟 引水隧洞 泉流量 MODFLOW-CFPv2模型 岩溶隧道 突涌水 云南锰矿沟岩溶水系统 

分 类 号:U453.6[建筑科学—桥梁与隧道工程] P641.2[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象