检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张光亮 Zhang Guangliang(CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200032,China)
机构地区:[1]中交第三航务工程局有限公司,上海200032
出 处:《港口航道与近海工程》2024年第3期130-134,共5页Port,Waterway and Offshore Engineering
摘 要:新建商合杭铁路跨颍河特大桥为塔梁分离的双塔双索面预应力混凝土矮塔斜拉桥,主桥为半漂浮体系,主塔为空间桁架式索塔。结合桥梁半漂浮构造特点,设计了塔梁拉压钢支墩的临时固结体系,以满足悬浇作业的安全要求。针对淮北地区冬天极寒、夏天高温的特点,设计了“四位一体”挂篮系统,具备节段悬浇作业、冬季蒸养保温、夏季自动喷淋和安全封闭的功能。通过BIM技术的有效应用,进行方案推演、虚拟拼装以及可视化交底等,保证了施工组织的顺畅。New-built Yinghe river super bridge of Shangqiu-Hefei-Hangzhou railway is a prestressed concrete cable-stayed bridge with two-tower,double-cable and tower-beam separated structure.The main bridge bases on a semi-floating system and the main tower is a space truss cable tower.By referring to the characteristics of semi-floating bridge,a temporary fixing system was designed to meet the requirements of safety for cast-in-cantilever,which was defined as the steel abutments being tensed and pressed by towers and beams.In view of the climate covering the north side of Huaihe river,namely,extreme cold in winter and high temperature in summer,a system of four-in-one hanging basket was designed to realize the functions of cast-in-cantilever by section,heat preservation with vapour in winter,automatic water sprinkling and safe closure in summer.BIM technology was effectively applied for strategy deduction,virtual assembly and visual disclosure,which ensured the smooth organization of construction processes.
关 键 词:高速铁路 斜拉桥 半漂浮体系 临时固结 四位一体挂篮 BIM技术应用
分 类 号:U445.466[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249