作 者:唐卫新 沈力 张费 TANG Weixin;SHEN Li;ZHANG Fei(Shanghai Construction Wujian Group Co.,Ltd.,Shanghai 200333,China)
出 处:《工程质量》2024年第S01期176-181,共6页Construction Quality
摘 要:随着越来越多商业办公大楼的不断兴建,人们对于楼宇功能及环境舒适度要求的提升与日俱增,作为提供舒适度所需负荷的来源,冷水机组、锅炉、柴发等大型设备的安装就位是整个项目中后期施工的核心工序。特别是在一些环境复杂,空间受限的困难条件下进行大型设备的吊装就位,是该类项目施工过程中必须要克服的施工难点。With the continuous construction of more and more commercial office buildings,people's requirements for building functions and environmental comfort are increasing day by day.As the source of load required to provide comfort,the installation of large equipment such as chiller,boiler,firewood and hair is the core process of the entire project construction in the middle and late stage.Especially in some difficult conditions of complex environment and limited space,the hoisting and positioning of large equipment is the construction difficulty that must be overcome in the construction process of such projects.
分 类 号:TU758[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38