检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:令宜凡 LING Yi-fan(China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,China)
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《价值工程》2024年第16期18-21,共4页Value Engineering
摘 要:BIM技术可覆盖地铁工程建设全生命周期的各个阶段,为设计、施工、运维管理等不同阶段提供及时、完整的信息,本文通过对西安城市轨道交通三期建设规划中实施的BIM技术应用的研究,为持续提高地铁建筑信息化程度,达到提高设计质量、提高方案决策效率,实现多方协同管理,协调设计与施工之间的矛盾,控制成本的目的,提高了管理效率。BIM technology can cover all stages of the entire lifecycle of subway construction,providing timely and complete information for different stages such as design,construction,and operation and maintenance management.This article conducts research on the application of BIM technology in the construction plan of Xi'an Urban Rail Transit Phase Ⅲ,aiming to continuously improve the informationization level of subway buildings,improve design quality,improve scheme decision-making efficiency,achieve multi-party collaborative management,coordinate the coordination between design and construction,control costs,and improve management efficiency.
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7