跨高铁公路桥连续梁拆除施工方案分析  

Analysis on Construction Schemes for Demolition of Cross-Railway Continuous Beam of Highway Bridges

在线阅读下载全文

作  者:阮海斌 陈兵兵 Ruan Haibin;Chen Bingbing(China Railway Shanghai Bureau Group Co.,Ltd.Hangzhou Railway Hub Construction Headquarters,Hangzhou,China;China Railway NO.3 Engineering Group the Second Engineering Co.,Ltd.,Shijiazhuang,China)

机构地区:[1]中国铁路上海局集团有限公司杭州铁路枢纽工程建设指挥部,浙江杭州 [2]中铁三局集团第二工程有限公司,河北石家庄

出  处:《科学技术创新》2024年第11期193-196,共4页Scientific and Technological Innovation

摘  要:既有公路桥连续梁上跨高速铁路,对该连续梁的拆除施工方案进行分析。分别针对边跨切割履带吊整体拆除、整体顶推、跨中切割后顶推拆除三个施工方案进行研究。分析各方案中连续梁的加固措施、内力、施工风险等因素,为该工程的安全实施提供优化建议。The existing continuous beam crosses high-speed railways.Analyzing the demolition construction plans for continuous beams.Studying the following three construction plans.The first scheme is to cut the beam at the edge span and then use a crawler crane to remove the mid span beam.The second scheme is to directly move the entire beam.The third scheme is to cut the beam at the mid span and then push the beam forward.Analyzing the reinforcement measures,internal forces,construction risks,and other factors of continuous beams in each scheme.Providing optimization suggestions for the safe implementation of the project.

关 键 词:连续梁拆除 施工方案分析 上跨高铁 

分 类 号:U445.6[建筑科学—桥梁与隧道工程]

 