检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:渐明柱 JIAN Ming-zhu(China Railway Liuyuan Group Co.Ltd.,Tianjin 300308,China)
机构地区:[1]中铁第六勘察设计院集团有限公司,天津300308
出 处:《工程建设与设计》2024年第9期138-140,共3页Construction & Design for Engineering
摘 要:某工程污水处理采用一体化污水处理设备,在工艺的末端设置清水池。由于工程条件的不同,在处理水质的要求、进出水量的控制、水池液位的设置要求也有所不同。论文通过对工程各项条件的分析对比,提出合理的清水池液位控制方案、绿化回用供排水方案。An integrated sewage treatment equipment is used for sewage treatment of a project,and a clean water tank is set at the end of the process.Due to different engineering conditions,the requirements for water quality treatment,control of water inflow and outflow,and setting of pool level are also different.Based on the analysis and comparison of various conditions of the project,this paper puts forward a reasonable level control scheme of the cleanwater tank,a greening and reusewater supply and drainage scheme.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.164.218