检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李世春 LI Shi-chun(Rower China Sinohydro Bureau 14 Co.Ltd.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,昆明650041
出 处:《工程建设与设计》2024年第8期212-215,共4页Construction & Design for Engineering
摘 要:地下厂房系统工程是目前最为复杂的地下空间利用实例,其技术管理工作难度大、范围广,是一项综合性的工作。通过总结多个地下厂房系统工程的施工经验,主要从施工通道的设计与规划、地下洞室围岩稳定控制、防洪度汛问题及通风散烟问题等方面出发,探讨技术管理的重点与对策。Underground plant system engineering is the most complex underground space utilization example at present,its technical management is difficult,wide range,which is a comprehensive work.By summarizing the construction experience of several underground powerhouse system projects,this paper mainly discusses the key points and countermeasures of technical management from the aspects of the design and planning of construction channels,the stability control of underground cavern surrounding rock,flood control and ventilation smoke,and so on.
关 键 词:地下厂房系统工程 施工技术管理 施工通道 洞室围岩
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.54.80