检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张怀宇 夏清[2,3] 张丙金 谭振飞 董成 孙宇军 赖晓文 ZHANG Huaiyu;XIA Qing;ZHANG Bingjin;TAN Zhenfei;DONG Cheng;SUN Yujun;LAI Xiaowen(East China Branch of State Grid Corporation of China,Shanghai 200120,China;Department of Electrical Engineering,Tsinghua University,Beijing 100084,China;Beijing Tsintergy Technology Co.,Ltd.,Beijing 100084,China;Key Laboratory of Control of Power Transmission and Conversion(Shanghai Jiao Tong University),Shanghai 200240,China)
机构地区:[1]国家电网有限公司华东分部,上海市200120 [2]清华大学电机工程与应用电子技术系,北京市100084 [3]北京清能互联科技有限公司,北京市100084 [4]电力传输与功率变换控制教育部重点实验室(上海交通大学),上海市200240
出 处:《电力系统自动化》2024年第11期143-152,共10页Automation of Electric Power Systems
基 金:国家自然科学基金资助项目(52207122);中国博士后科学基金资助项目(2022TQ0206)。
摘 要:随着电力市场改革的推进,华东区域各省级市场均已进入试运行阶段,为统筹兼顾现货市场平稳运营与区域电网安全运行,迫切需要研究更高效的网省协同运行机制。首先,分析了现货市场环境下网省调度协同模式的挑战与改进思路。然后,构建了区域电网调度可行域与省市调度可行域模型,提出可行域模型的降维与线性化处理方法。在此基础上,提出了基于调度可行域的网省协同优化运行机制,重点对网省两级协同运行的业务流程、省市可行域的计算方法进行了探讨。最后,通过区域电网的算例分析,验证了调度可行域模型与两级市场协同运行机制的有效性。With the advancement of electricity market reform,all provincial markets in East China region have been in the trial operation stage.In order to balance the smooth operation of the electricity spot market and the safe operation of regional power grid,it is urgent to study a more efficient region-province cooperative operation mechanism.First,the challenges and thoughts for the improvement of region-province scheduling cooperative mode under the background of electricity spot market are analyzed.Then,the feasible region models of the regional power grid scheduling and provincial and municipal scheduling are constructed,and the method for dimensionality reduction and linearization of the feasible region model is proposed.On this basis,a regionprovince cooperative and optimized operation mechanism based on the scheduling feasible region is proposed,which focuses on exploring the business process of region-province two-level cooperative operation and the calculation method of provincial and municipal feasible regions.Finally,the effectiveness of the scheduling feasible region model and the two-level market cooperative operation mechanism is verified through the analysis of regional power grid cases.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.55.178