基于业主视角的工期延误索赔管理研究——以F水电站工程项目为例  被引量:1

Study on Construction Delay Claims Management from the Owner's Perspective:Taking F Hydropower Project as an Example

在线阅读下载全文

作  者:罗颖芳 邹景谋 付玉凤 卜炜玮[2] LUO Yingfang;ZOU Jingmou;FU Yufeng;BU Weiwei(Yunnan Natural Gas Co.,Ltd,Kunming 650200,China;Yunnan University,Kunming 650500,China)

机构地区:[1]云南省天然气有限公司,云南昆明650200 [2]云南大学,云南昆明650500

出  处:《建筑经济》2024年第6期67-72,共6页Construction Economy

摘  要:从业主视角出发,以F水电站工程项目索赔管理为研究对象,对该项目实施进程中两个工期延误索赔案例的处理过程和结果进行介绍,结合现有研究对比分析F水电站业主面对两索赔事件时实施索赔管理的思路与模式,总结工程项目在索赔应对过程中应遵循的管理原则,并提出工期延误索赔管理的启示,以期为业主方工期延误索赔管理提供参考。Starting from the owner's point of view,taking the claim management of the F hydropower plant project as the research object,introducing the handling process and results of the two construction delay claim cases in the project implementation process,combining with the existing research to comparatively analyse the ideas and modes of claim management implemented by the owner of the F hydropower plant in the face of the two claim events,to summarise the management principles that should be followed by the engineering project in the process of responding to the claims,and to put forward the revelation of the construction delay claim management in order to provide the reference for the owner's side of the construction delay claim management.

关 键 词:工期延误索赔 业主方 水电站工程项目 案例研究 

分 类 号:F426[经济管理—产业经济] TU723.3[建筑科学—建筑技术科学]

 