检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁靖梓 LIANG Jingzi(Liuzhou Electric Power Survey and Design Co.,Ltd.,Liuzhou 545000,China)
机构地区:[1]柳州电力勘察设计有限公司,广西柳州545000
出 处:《中国厨卫》2024年第5期96-98,共3页Chinese Kitchen & Bathroom
摘 要:变电站建筑工程是电力系统中的重要组成部分,其建设质量直接影响着电网的稳定性和可靠性。然而,在实际施工过程中,受到各种因素的影响,变电站建筑工程面临着一些问题和挑战。文章通过分析变电站建筑工程中存在的问题,提出了相应的解决方案,有效地提高了变电站建设的质量和效率,为今后的变电站建设提供了有益的经验参考。Substation construction engineering is an important part of power system,and its construction quality directly affects the stability and reliability of power grid.However,in the actual construction process,affected by various factors,substation construction engineering is facing some problems and challenges.By analyzing the problems existing in substation construction engineering,this paper puts forward corresponding solutions,which effectively improves the quality and efficiency of substation construction,and provides beneficial experience reference for future substation construction.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7