上跨电化铁路桥梁改造防护技术研究  

Research on Protection Technology for Upcrossing Electrified Railway Bridge Renovation

在线阅读下载全文

作  者:李楠楠 LI Nannan(China Railway 23rd Bureau Group Second Engineering Co.,Ltd.,Qiqihar 161000,China)

机构地区:[1]中铁二十三局集团第二工程有限公司,黑龙江齐齐哈尔161000

出  处:《中国厨卫》2024年第5期242-244,247,共4页Chinese Kitchen & Bathroom

摘  要:为解决跨越电化铁路桥梁改造施工中铁路“天窗”时间短、施工干扰大、施工空间狭窄、安全防护难度大等难题,文章针对南浦立交桥改造工程跨越4条繁忙铁路干线和1条专用线桥梁改造施工,提出了一种可移动吊装防护施工作业平台方法,从而避免了拆除电化设备和长时间的既有线施工作业,减小了对哈齐高速铁路及平齐电化铁路的影响,解决了公路、铁路施工安全防护问题,有效提高了“天窗”时间利用率,以期为相关工程提供借鉴。In order to solve the problems of short railway“skylight”time,large construction interference,narrow construction space,and difficult safety protection in the construction of bridge renovation across electrified railways,this article proposes a movable lifting and protection construction platform method for the Nanpu Overpass Bridge Renovation Project,which spans four busy railway trunk lines and one dedicated line bridge renovation.This avoids the dismantling of electrified equipment and long-term construction operations on existing lines,reduces the impact on the Haqi high-speed railway and Pingqi electrified railway,solves the safety protection problems of highway and railway construction,effectively improves the utilization rate of“skylight”time,and provides reference for related projects.

关 键 词:桥梁施工 防护安全 高速铁路 

分 类 号:TU997[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象