检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:葛晨光 陈泽伟 GE Chenguang;CHEN Zewei(Beijing Municipal Administration Division of Guanting Reservior,Zhangjiakou 075441,China)
机构地区:[1]北京市官厅水库管理处,河北张家口075441
出 处:《北京水务》2024年第S01期10-14,共5页Beijing Water
摘 要:为了更加准确地确定官厅水库八号桥水文站定线方法,使流量数据更加可靠,研究了以2021年为典型年的官厅八号桥水文站水位流量关系曲线的变化规律,运用了SL/T 247—2020中《水文资料整编规范》单一线、连实测过程线等定线和检验方法,分析了官厅水库八号桥水文站2021年实测流量数据的定线过程。结果表明:畅流期实测流量适宜选用单一线法定线,冰冻期适合采用连实测过程线法定线。通过不同时期选用合适的水文定线方法,提升了定线的合理性,对水情报讯、水文应急服务以及水文资料整编工作具有重要意义。In order to more accurately determine the alignment method of the Guanting Reservoir No.8 Bridge Hydrological Station and make the flow data more reliable,the variation law of the water level flow relationship curve of the Guanting Reservoir No.8 Bridge Hydrological Station in 2021 was studied.The alignment and inspection methods of single line and continuous measured process lines in the"Hydrologi-cal Data Compilation Specification"SL/T 247-2020 were used to analyze the alignment process of the measured flow data of the Guanting Reservoir No.8 Bridge Hydrological Station in 2021.The results indi-cate that during the smooth flow period,a single line is suitable for measuring flow rate,and during the freezing period,a continuous measurement process line is suitable for measuring flow rate.By selecting appropriate hydrological routing methods at different stages,Significantly improved the rationality of the alignment.which is of great significance for meeting the needs of water situation reporting,hydrological emergency services,and hydrological data compilation work.
关 键 词:官厅水库 八号桥水文站 实测流量 关系曲线 定线分析
分 类 号:TV697[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248