跨海大桥钢吊箱围堰施工技术几点思考  

Several Considerations on the Construction Technology of Steel Suspension Box Cofferdam for Cross Sea Bridges

在线阅读下载全文

作  者:屈文强 Qu Wenqiang(China Railway Construction Port and Navigation Bureau Group Co.,Ltd.Fourth Engineering Branch,Chongqing,China)

机构地区:[1]中国铁建港航局集团有限公司第四工程分公司,重庆

出  处:《科学技术创新》2024年第13期181-184,共4页Scientific and Technological Innovation

摘  要:实际进行跨海大桥钢吊箱围堰施工过程中,应充分发挥围堰施工技术的优势,结合施工现场的实际状况制定钢吊箱围堰施工方案,并将其落实到具体施工中,最大程度地提高钢吊箱围堰施工质量。本文依托双屿门跨海大桥钢吊箱围堰施工技术的应用情况进行一系列论述,阐述了跨海大桥钢吊箱围堰施工要求以及钢吊箱围堰施工技术的具体应用。In the actual construction process of steel suspension box cofferdam for cross sea bridges,the advantages of cofferdam construction technology should be fully utilized,and a construction plan for steel suspension box cofferdam should be formulated based on the actual situation of the construction site,and it should be implemented in specific construction to maximize the quality of steel suspension box cofferdam construction.This article provides a series of discussions based on the application of steel suspension box cofferdam construction technology for the Shuangyumen Cross Sea Bridge,elaborating on the construction requirements and specific applications of steel suspension box cofferdam construction technology for cross sea bridges.

关 键 词:跨海大桥 钢吊箱 围堰施工 

分 类 号:U445.556[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象