检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高尚青 王迪 夏洪波 罗志雄 李培良 GAO Shangqing;WANG Di;XIAO Hongbo;LUO Zhixiong;LI Peiliang(China Coal Information Institute,National Institute for Occupational Safety,Beijing 100029,China)
出 处:《矿业工程》2024年第3期32-35,共4页Mining Engineering
摘 要:针对尾矿井下充填后溢流部分入库使尾矿库防洪压力偏大的问题,以某金矿尾矿库为研究对象,提出了强化其防洪能力的安全措施。结果表明:采取逆向支管水力冲击放矿方式,控制库水位和干滩,能显著地提高尾矿库的干滩长度、干滩坡度及安全超高,并极大地提高了尾矿库的防洪安全能力。To address the problem of excessive flood control pressure of the tailings storage facility caused by the overflow part of the tailings entering the tailings storage facility after underground filling is finished,a tailings storage facility of a gold mine is taken as the research object,and safety measures to strengthen its flood control capacity are put forward.The results show that adopting the reverse branch hydraulic impact ore-drawing method to control the water level and dry beach of the tailings storage facility can significantly improve the length,slope,and safety superelevation of the dry beach,and greatly improve the flood control safety capacity of the tailings storage facility.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49