检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:葛晓 徐从战 Ge Xiao;Xu Congzhan(China National Building Materials(Hefei)Powder Technology Equipment Co.,Ltd.,Hefei,230051,China)
机构地区:[1]中建材(合肥)粉体科技装备有限公司,安徽合肥230051
出 处:《水泥工程》2024年第2期59-62,共4页Cement Engineering
摘 要:某3 200 t/d熟料生产线生料磨为MLS3626立磨系统。经过十几年运转,故障率较高,系统运行不稳定,维护量较大,为此,实施了辊压机替换改造。生料制备采用辊压机终粉磨系统替换立磨终粉磨系统后,台时产量同比增加了30%,粉磨工段电耗降低了4 kWh/t,具有良好的社会效益和经济效益,为水泥企业提质增效,降耗减排,可持续发展奠定了基础。A 3200 t/d clinker production line uses MLS3626 vertical mill system for raw material grinding.After more than a decade of operation,the failure rate is high,the system operates unstable,and the maintenance workload is large.Therefore,a roller press replace-ment transformation has been implemented.After the final grinding system of roller press was used to replace the vertical mill in raw meal preparation in cement enterprises,the hourly output increased by 30%year-on-year,and the power consumption in grinding sec-tion decreased by 4 kWh/t,which has good social and economic benefit.It laid a foundation for cement enterprises to improve the ce-ment quality and efficiency,reduce consumption and emission,and achieve sustainable development.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70